Whilst out this trip, I have also carried out a couple of other odd jobs. One was installing LED lighting to the gazebo, which creates a lovely atmosphere in the evening. The second job was to install the ‘egg’ chair under the gazebo, which is super comfortable and is great for lazing in the evening sunshire.
The last job was to install some planters into the top of the ‘jumping wall’, which will get planted later on when we have tiled the top.