Just before coming out I had organised with the local builder to backfill to the retaining wall that I built last month. When I arrived we covered the entire area with around 150mm of hardcore and crushed granite, all of which was compacted by a big roller. Next for the…
Whilst out this trip, I have also carried out a couple of other odd jobs. One was installing LED lighting to the gazebo, which creates a lovely atmosphere in the evening. The second job was to install the ‘egg’ chair under the gazebo, which is super comfortable and is great…
I have come over for a couple of weeks to make sure more progress on the landscaping around the pool. The job for this trip is to build a new retaining wall for what will become the AstroTurf area.