This update shows the process of tiling of the upper terrace areas, which has taken a quite a long time to complete. The slab directly outside of the pool house had to be broken up and re-laid, as we realised it was too high for effective water run off away…
One of the key features of the pool area is the pool house, which will have a small kitchenette, shower room and a couple of sofas. This building used to be the garage and was converted / renovated on the outside over the last couple of years. Over the last…
On this trip to France this time my daughter made the final set of steps that we are planning for this build. They lead from the AstroTurf down into what is referred to as the dairy barn.